Uncategorized

Back to work this morning.

Posted on

Working on the dash today.  Welding and grinding up all the non wanted and needed holes like the seatbelt and brake warning lights, and getting it ready for the backdate process. Have everything needed now, I such as switches and the Blaupunkt Radio, mirror, etc.   

LET THE PAINT FLOW

Posted on

image

The first two coats of base went on good.  Spraying OEM Ruby Red on the interior and window jams.

Adding a through body sway bar.

Posted on

After deciding to change the sway bar to a through body and speaking to Chuck at Elephant racing who has my struts right now I had to drill out the location and test fit the sway bar.  I was able to do this in a few hours.

image

image

image

image

image